# Critical infrastructure

In energy, water and communications, vendors ship models into systems operators own.

> **Intended, not deployed.** Intended application areas. Vraelis has no customer deployments in them.

## The vendor ships it. The operator runs it.

### Releases cross operators

Both sides need to know which release is running.

### An unexpected release is a security and operational risk

A change to an operational system, to be reviewed as one.

### The change record needs the model

What was approved, for where, and what the runtime reported.

## The workflow, in this area

1. Identify the release.
2. Bind approval to the release and destination. Destination-bound approval: one site's approval does not cover another.
3. Integrate with a supported runtime.
4. Compare approved and reported.
5. Preserve discrepancies, missing evidence and recovery. Deployment evidence kept for the operator's change process.

![No loaded report is available for this observation.](https://vraelis.com/v8/contour/crop-loaded-unavailable.webp)

*Read-only evidence app, inside the controlled ONNX reference experiment.*

## Not claimed

- No deployments with utilities or other operators, and no customers.
- No integration with control systems or operational technology networks.
- No replacement for an operator's change management or protective controls.
- No certification or regulatory compliance.
- No hardware attestation. Runtime identity is a worker self-report.

- [Critical infrastructure on vraelis.com](https://vraelis.com/applications/critical-infrastructure): The page this summary comes from.
- [Security evidence](https://docs.vraelis.com/security-evidence): Related research.
- [Machine trust](https://docs.vraelis.com/machine-trust): Related research.
- [Model integrity](https://docs.vraelis.com/model-integrity): Related research.

---

Vraelis documentation, Vraelis. https://docs.vraelis.com/critical-infrastructure
